FileMaker Ticket Delivery
Preconditions
- Read the current ticket, relevant confirmed decisions, and the project's delivery rules.
- For early analysis, label the response as a draft or return only the questions needed to continue.
- Do not describe a proposal, an unverified assumption, or an open dependency as completed implementation.
- Never send, post, or otherwise deliver the reply unless explicitly asked.
- Provide a completed or reviewed-work reply only after all major changes have been closed and reviewed, or when explicitly requested.
Project-manager reply
- Lead with completed work, followed only by unresolved questions or confirmations needed.
- Use concise, practical, client-facing English. Remove internal exploration and unused architecture proposals.
- Distinguish completed work from proposed next steps.
- For a larger ticket, use concise sections such as
COMPLETED,QUESTIONS, andKEY CALCULATIONSwhen they improve readability. - When useful for verification, give a friendly label followed by the exact FileMaker object name in brackets, for example
Utility Switch [APPROVE::UtilitySwitch]. - Include exact layout, script, custom function, or value-list names only when they materially help verification.
- Include FileMaker code only when a calculation or script rule is central to approval. Put it at the end under a concise
KEY CALCULATIONSorKEY SCRIPT LOGICheading. - If current architecture already fulfills the present requirement, omit unused future tables or designs from the completed-work summary. Raise them only when a distinct business decision is needed.
Short work report
Every project-manager reply must end with a short work report. It is a compact billable-work summary, not a list of questions.
- Maximum 450 characters, including title, bullets, and line breaks.
- Start with the ticket number and a short title.
- Use one to three short past-tense bullets describing completed work.
- Exclude code, open questions, testing instructions, and unconfirmed claims.
- Put the report in a fenced
textblock so it is easy to copy.
Example:
52926 Fuel Switch – Phase Tracking
- Added start and end timestamps, duration tracking and status fields across the current Customer, Evaluation, Approval, Installation and QA phases.
- Verified funding stream eligibility and its default value during import.
- Kept the new status tracking separate from the fields currently used by reports.